Quote vs estimate: what’s the difference?
A quote is a fixed price for defined work; an estimate is a best guess that can change. When to send which, and how to turn one into the other.
Twenty-two plain-English answers to the questions that come up when you are writing a quote — what it has to say, what it commits you to, and what to do when it goes quiet. Written for UK trades, with no assumption that you have quoted before.
A quote is a fixed price for defined work; an estimate is a best guess that can change. When to send which, and how to turn one into the other.
A quote is an offer, not yet a contract — binding the moment the customer accepts it. Including the 14-day rule that catches people out.
Thirty days is the usual answer for UK trades, shorter when a material’s price is moving. Why the date matters and what to do once it passes.
If you are VAT-registered, show it: subtotal, VAT on its own line, then the total. If you are not, say so. The traps in between.
There is no legal figure. The defensible answer is what you have to buy before you start — materials, not a slice of your profit.
Usually not — a free quote is what customers expect. When a fee is fair, how to say so before the visit, and how to make each quote cost you less.
Six steps, in order: see the job, write the scope down, price each part, put it in writing, send it the same day, and follow up once.
Hours at your rate, materials at cost, the overheads everyone forgets, then margin — and a sanity check before you send. A method, not a price list.
A free template to download as Word or PDF, and the nine sections a trade quote needs, in order, with what belongs in each.
Yes — each part of the job on its own line with a price, and one total. How far to break it down, and why your margin stays off the page.
What a UK electrical quote has to carry: scope line by line, certification and notification, VAT, a valid-until date, exclusions and payment terms.
Itemised scope, your Gas Safe number, what gets commissioned and notified, VAT, exclusions, and how to price what you cannot see yet.
Scope by stage, provisional sums, the programme, variations, payment stages and exclusions — for work that runs long and involves other trades.
The access priced openly, the materials named, building regulations handled in one line, and a stated plan for the timbers nobody has seen yet.
The prep spelled out, the spec fixed in coats and named products, who supplies the paint and the paper, and VAT shown — or its absence stated.
Silence usually isn’t a no. How long to wait, how to follow up once without nagging, and how to make a quote easier to say yes to.
A take-off, step by step: what to count, what to measure off the scale, what a drawing cannot tell you, and why the revision number belongs on the quote.
Digital records and quarterly updates, phased in by income from April 2026. Who is caught when, the software you actually need, and the job your invoicing has to do.
The starting point stated per surface — skim, overboard or hack off — the system coat by coat, and the surprise behind the woodchip priced before it appears.
Who supplies the tiles, the wastage allowance the customer orders by, prep and tanking priced openly, and the pattern named — herringbone is not the price of brick bond.
Your Gas Safe number, the kit named by make, model and output, the flush and filter spelled out, the warranty registered, and a deposit tied to the boiler order.
The dig-out and muck away priced openly, the build-up layer by layer, the water given somewhere to go, and provisional sums for what is under the lawn.